Puan:0,00
Bizdeki Fiyatı:$ 0,00 + KDV
Kdv Dahil Fiyatı:$ 0,00

Oak  Meşe




OAK
TECHNICAL INFORMATIONMAXI FLOOR BOARDFLOOR BOARDSTAVE
LENGTH (mm)1500/25001500/30001200/20001000/1200
WIDTH (mm)150/220120/300120/150120
THICKNESS (mm)1520152015
QUALITYI° - II°I° - II°I° - II°I° - II°I° - II°

Commercial name: Oak
Scientifica name: Quercus Petraea (Matt) Liebl, Quercus robur L.
Brinell Hardness (Kg/mm2): 3,03
Size stability: good
Bathroom, kitchen, heated footing laying: good

MANUFACTURING AND FINISHES AVAILABLE

PRE-SANDED: oiled or natural waxed; natural varnish; old coloring varnish (all)
BRUSHED: oiled or natural waxed; natural varnish; old coloring varnish (all); special coloring varnish (all)
WORN EFFECT PLANING: oiled or natural waxed; old coloring varnished (all) and waxed
BORGOGNA PLANING: oiled or natural waxed; old coloring varnished (M1-Q2-V3) and waxed
HEWED: oiled or natural waxed; old coloring varnished (all) and waxed;
SAWED: special coloring varnish (CFG-R00)

Oak or Ash counterbalance


Laying plan

- Solidity and firmness of laying surface.
- Thickness uniformity and sub-base rigidity.
- Cracks and splits absence.
- Sub-base humidity content, measured with carbide hygrometer, must always be under 1.7% (cementituos) or 0.2% (anhydride).
- Sub-base cleanliness.
- A suitable moisture screen or barrier must be present.
- In case of floor heating system, it must have been previously tested and laying must be carried out with the system switched off.

Site conditions

- Room temperature must be between 14 and 278C.
- Air humidity must be between 40 and 60%.
- Rooms must be completed with windows, doors and shutters.
- Walls tinting must be completed.
- Any sort of job that may damage flooring must be completed at delivery and before laying.

Gluing system laying

This type of laying must follow the technical directions concerning the adhesive used. The use of two-components glue is suggested.
Glue must be spread out perpendicularly to the laying line and with the correct spatula. Glue residue on floor-boards must be removed immediately.

Floating system laying

Laying must be done on a thermo-acoustic mat (eg. aluminised polyethylene sheet, cork, non-woven fabric, Yuta etc.) and making sure that a low water content vinyl adhesive is spread on the bottom tongue part in a punctiform manner.

Nailing system laying

This technique consists of oblique nails penetrating between the tongue and laying base made of cement damped softwood joists, wooden floor-boards or wooden panels. The tongue must be turned towards the wall and the groove opposite towards the inside of the room.